
Cyprus · 17 projects
Room by room.Cost, sequence, permits.
Renovation planning for Cypriot homes: what each project involves, what it usually costs, what needs permission and what order the trades come in.
- Costs from recorded quotes
- Permit rules cited
- Written for Cypriot building stock
Photo: Dominik Pajor
01What Renovate covers
Room by room.Cost, sequence, permits.
The homeowner-side planning layer, ahead of the first quote.

Plastering
Skim, render and the lime plasters that stone village houses need instead of cement.
5 listedTiling
Floor, wall and wet-room tiling, including the substrate work that decides whether it lasts.
20 listedPainting and decorating
Interior and exterior painting, with the elastomeric exterior systems that survive UV at this latitude.
37 listedHome renovation
Whole-house renovation: sequencing, permits, budget and the order the trades need to arrive in.
53 listedBathroom renovation
Full bathroom rebuilds, including the tanking that stops the flat below finding out first.
44 listedKitchen renovation
Kitchen replacement from strip-out to final connection, with realistic lead times on units.
6 listedFlooring
Tile, timber, vinyl and microcement, and which of them survives underfloor heating.
50 listedRewiring
Full rewires for properties on original 1970s and 1980s installations, brought to current standards.
19 listedReplumbing
Replacing galvanised and early plastic pipework before it fails rather than after.
14 listedWindow replacement
Aluminium and uPVC replacement, thermal breaks and the shading that matters more here than U-values.

Insulation
Roof, wall and thermal-bridge insulation aimed at summer cooling as much as winter heating.

Damp proofing
Rising damp, condensation and the salt-related decay common in older coastal masonry.
58 listedHouse extension
Ground and first-floor extensions, from planning permission through to completion certificate.

Loft conversion
Roof-space conversion where the pitch allows it, with the structural work it implies.

Veranda enclosure
Enclosing verandas and balconies, including when it counts as an extension for planning.
6 listedPergola
Timber, aluminium and bioclimatic pergolas, sized for shade rather than for photographs.
32 listedPlanning and building permits
Planning permission and building permits, the sequence, and what happens without them.
02How it works
Four steps.No account needed.
Pick the project
Start from the work you actually need done rather than from a company name you half remember.
Step one
Narrow to your area
Coverage in Cyprus is genuinely local. A Paphos specialist rarely quotes competitively in Famagusta.
Five districts
Check the range
Every price range comes from quoted projects we have recorded, with the sample size shown beside it.
Sample size shown
Contact directly
You deal with the company. We take no commission, so nothing about the ordering changes when you do.
No middleman

Know what you need?Get up to five quotes.
Describe the project and we will gather quotes from companies that can handle the whole sequence.