
Cyprus · planning and building permits
Planning and building permits in Cyprus.Compare several quotes at once.
Planning permission and building permits, the sequence, and what happens without them.
- Costs from recorded quotes
- Permit rules cited
- Written for Cypriot building stock
Photo: Anete Lusina
- Companies listed
- 32
- Districts covered
- 4
From our own network
Our own servicesWe own and operate these sites. They appear in this separate, labelled section and are not part of the ranked list below. How we rank.
Planning and building permits companies in Cyprus
12 companies covering this area.
CyRIC
structural engineering · Makedonitissa, Nicosia
CyRIC is an engineering practice in Makedonitissa, in the Nicosia district. Recorded services include structural calculations, surveys, certificates.
- Structural calculations
- Surveys
- Certificates
Polart Construction
planning permits · Strovolos Iii, Nicosia
Polart Construction is an architecture practice in Strovolos Iii, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Karyatides
planning permits · Strovolos, Nicosia
Karyatides is an architecture practice in Strovolos, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Lordos Architects
structural engineering · Tabakhane, Nicosia
Lordos Architects is a company in Tabakhane, in the Nicosia district.
Andreas Vlittis
planning permits · Paralimni, Famagusta
Andreas Vlittis is an architecture practice in Paralimni, in the Famagusta district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Nicolaides Viana Partnership
planning permits · Limassol Centre, Limassol
Nicolaides Viana Partnership is an architecture practice in Limassol Centre, in the Limassol district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
P. A. Constructions Ltd.
planning permits · Engomi, Nicosia
P. A. Constructions Ltd. is an architecture practice in Engomi, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Andreas S. Hadjizacharias Ltd
planning permits · Agios Nikolaos, Limassol
Andreas S. Hadjizacharias Ltd is an architecture practice in Agios Nikolaos, in the Limassol district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Uds Architects
planning permits · Limassol Centre, Limassol
Uds Architects is an architecture practice in Limassol Centre, in the Limassol district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
Fabretti Construction
planning permits · Agioi Omologites, Nicosia
Fabretti Construction is an architecture practice in Agioi Omologites, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
T.E.P. Lifts
structural engineering · Acropolis, Nicosia
T.E.P. Lifts is an engineering practice in Acropolis, in the Nicosia district. Recorded services include structural calculations, surveys, certificates.
- Structural calculations
- Surveys
- Certificates
Yakubiv
planning permits · Trypiotis, Nicosia
Yakubiv is an architecture practice in Trypiotis, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.
- Planning submissions
- Drawings
- Site supervision
01Before the first quote
Planning planning and building permitsin the right order.
Most renovation overruns are sequence problems, not price problems. Four decisions to make before anyone quotes.
Write down what is being removed
Strip-out defines the job. The surprises live behind tiles and under floors, so say what goes before asking what it costs.
Scope first
Fix the sequence
Trades have an order — first fix before plaster, plaster before paint. A quote that ignores the order hides a second visit.
Order matters
Check what needs permission
Structural changes, drainage moves and most exterior work need permits, and the waiting time belongs in the plan.
Permits
Hold back the last payment
Stage payments tied to completed work keep everyone honest, and the final stage is your snagging leverage.
Stages

Need planning and building permits?One form. Up to five quotes.
Describe the project and we will gather quotes from companies that can handle the whole sequence.