Kitchen renovation

Renovating a kitchen in a Cyprus holiday rental

Refitting a holiday-let kitchen in Cyprus: the closure window, appliances and cabinetry that survive turnover, and judging spend against nights let.

8 min read

ByStavros Loizou· Editor, kitchens, bathrooms and finishes

Stavros covers the rooms that carry the most cost per square metre and the finishes that go into them. He tracks the order trades have to arrive in, which moves a Cypriot renovation bill further than any hourly rate does.

Published

A kitchen in a property you let has to do a job your own kitchen never does: be completely obvious to somebody who has never stood in it, survive being used badly by different people every week, and be repairable between two bookings. That points the specification towards freestanding appliances, serviceable parts, hard surfaces and a layout with nothing to learn. Decide the closure window first, choose components you can replace in a day, and set the spend against the nights the room actually earns.

Why rental property is different

Guests in a self-catering property cook less than they would at home and make more mess doing it. They open every drawer looking for a bottle opener, drag pans across the hob and leave the extractor off. That is what an unfamiliar kitchen used for one week produces.

Everything has to be findable. A rental kitchen is judged in the first ten minutes: deep pan drawers rather than low cupboards, a visible kettle and toaster, an obvious bin, a hob you can operate without reading anything. Clever storage that needs explaining is a complaint waiting to happen.

Appliances take the wear, and appliances are what fail. Ovens, fridges and dishwashers run near-continuously through the season and are cleaned hard between stays. A fridge failing in August, with a full week ahead, is not something a guest works around.

Water and heat find the weak points. Carcasses swell where water sits, door edges lift around a dishwasher, and the worktop joint at the sink is where a rental kitchen ages first. Each of those is a specification choice, not bad luck.

Those ranges are read from recorded quotes when the page loads, so they stay current. They start a conversation with a contractor rather than ending one.

Scheduling around bookings

A kitchen is easier to phase than a bathroom and harder to rush than owners expect, and the reason is the worktop.

In the eastern resort areas — Ayia Napa, Protaras, Paralimni — accommodation is predominantly seasonal and refurbishment is concentrated in November to March. That is the sensible window, and it is when the good fitters are booked, so enquire in spring for winter work. In Limassol, Paphos and Larnaca, where lets run closer to year-round, you are working in gaps instead — Protaras shows the same pattern in miniature, with short refurbishment windows between bookings.

The sequence runs strip-out, plumbing and electrical first fix, plastering and making good, floor, cabinet installation, worktop template and fit, appliance and sink connection, splashback, second fix and decorating. The step that catches people out is the worktop: stone and engineered worktops are templated after the cabinets are set and fabricated off site, so the fit is a second visit some days later, and until it lands there is no sink and no hob.

  • Ask when the template is booked, not just when the job starts. The fabricator's diary, not the fitter's, usually decides your reopening date.
  • Order appliances before the strip-out and have them on site. A held-up oven closes the property as effectively as an unfinished wall.
  • Consider a laminate worktop for a tight gap, cut and fitted on site the same day — the difference between a one-visit and a two-visit programme.
  • Book the electrician at both ends. Alterations to the installation are carried out and certified by a licensed electrician, and that certificate is what the supply authority relies on.
  • Check access early. In the Limassol high-rise stock, lift dimensions and the management committee's permitted working hours decide how a worktop and appliances reach the flat.

Durability over appearance

Specify for the fifth season, and for the day something fails mid-booking.

Freestanding appliances over integrated ones. A failed freestanding fridge or dishwasher is replaced in an afternoon; an integrated one means matching dimensions, a door panel and a fitter. Choose brands with a service and parts presence in Cyprus — that decides whether a repair happens within a changeover or after the guest has left.

Moisture-resistant carcasses and adjustable feet. The sink and dishwasher runs are where water reaches board edges. Ask what the carcass material is, ask for sealed cut edges around the sink, and ask for a removable base beneath it so a slow drip is visible rather than absorbed.

A worktop chosen for the joint, not the sample. Engineered stone handles heat and knives better and costs more; laminate is cheap, fast and entirely replaceable. Either works in a let. Timber does not, because it needs oiling nobody will do. Wherever you land, ask how the joint at the sink is detailed, and pair it with a decent-gauge stainless sink and a mixer whose cartridge you can buy locally.

A hob matched to the supply you have. Bottled LPG is a common cooking supply in Cypriot dwellings, and where it is used, bottle storage, ventilation and hose replacement are part of the specification rather than an afterthought. Induction removes the bottle and the flame and is easier to clean, but it needs the circuit capacity and it makes the guest's own pans irrelevant.

Extraction ducted outside, not recirculating. A charcoal filter nobody changes moves grease around the room. Add more sockets than you think you need, positioned for the counter — they are cheap at first fix and expensive afterwards.

Coastal corrosion. In Kato Paphos and other directly exposed locations, salt-laden air means galvanised and marine-grade fixings are standard, and in kitchens it shows up as pitted handles, corroded hinges and rusting appliance trim. Stainless is not one material — ask what grade.

Buy spares with the job: a spare door, a hinge set, a tap cartridge, a worktop offcut, and every appliance model number in the property file.

Cost against nightly rate

The question is not what the kitchen costs. It is what it is worth across the nights it helps you sell.

  1. What is the current kitchen costing you? In evidence, not impression: recurring guest comments, nights lost to an appliance failure, the rate you have not felt able to ask.
  2. How many let nights does the work close, and at what rate? A February closure in a seasonal eastern property costs almost nothing in bookings; the same closure in July costs a great deal. That is why a phased door-and-worktop job is often the better economics in a year-round letting area.
  3. Spread the spend over the life of the specification. Divide the cost over the seasons you expect it to serve, then set that annual figure against the rate and occupancy change you genuinely expect. If neither moves, the case is maintenance rather than revenue — still valid, but it should change how much you spend.
  4. Settle the VAT position before comparing quotes. Renovation and repair of a private residence in use for more than three years can be invoiced at the reduced VAT rate of 5% rather than the standard 19%, where the value of the materials does not exceed 50% of the value of the services. A kitchen is material-heavy, so that condition is worth checking carefully, and whether a commercially let property meets the private-residence test is a question for your accountant and the Tax Department.

Replacing fittings and finishes inside an existing kitchen, with no change to structure, layout or external appearance, sits outside permit scope. Removing a wall to open the kitchen into the living room is a different question — whether it is load-bearing is for a qualified engineer, and ETEK maintains the register of engineers and technical professionals in Cyprus. Our kitchen renovation pages set out the sequence stage by stage, and the area pages record what changes where you are.

Common questions

Is a full refit worth it, or should I just replace the doors?

Replace doors, worktop, sink, tap and appliances if the carcasses are sound and the layout works — that gets nearly all of the guest-visible improvement in a much shorter closure. Go for a full refit when the layout is wrong for self-catering, when the carcasses are water-damaged, or when the wiring and plumbing behind them need doing anyway.

How long will the kitchen be out of use?

Longer than the fitting days if you choose engineered stone, because it is templated after the cabinets are set and fabricated off site, so the fit is a second visit some days later. Ask for a programme by stage with the template and fit dates named. If the gap does not fit your calendar, a same-day-cut worktop material changes the answer.

What appliances should a self-catering kitchen have?

Guests expect a fridge with a usable freezer, an oven and hob, a microwave, a dishwasher, a kettle and a toaster, plus a washing machine somewhere in the property. Beyond that, extra appliances add cleaning and failure points rather than bookings.

Does a kitchen refit need a permit?

Replacing fittings and finishes inside an existing kitchen, with no change to structure, layout or external appearance, sits outside permit scope. Structural alterations, new openings and changes to drainage or external appearance are not. In an apartment block the management committee's rules on working hours, lift use and common services apply separately from planning permission, and in the coastal high-rise stock they are usually stricter than owners expect.

What should I keep after the job?

The electrical certificate, appliance model numbers and warranty documents, the worktop material and any offcut, the door range and colour reference, the hinge type, the mixer model, and the invoices showing the VAT rate applied.

Kitchen renovation firms by district

8 companies covering this area.

Sources

  1. Electricity Authority of Cyprus — installation and connection requirements — retrieved 2026-07-29
  2. Tax Department — VAT rates and reduced-rate conditions — retrieved 2026-07-29
  3. Department of Town Planning and Housing — scope of planning control — retrieved 2026-07-29
  4. Cyprus Scientific and Technical Chamber (ETEK) — technical practice — retrieved 2026-07-29

Thinking of doing this?Get up to five quotes, free.

Describe the project and we will gather quotes from companies that can handle the whole sequence.

Get up to 5 quotes.Free, with no obligation.

Tell us briefly what you need. We gather quotes from qualified companies where you live, so you do not have to ring round yourself.

Free · No obligation · You decide whether to go ahead